• mojofrododojo@lemmy.world
    link
    fedilink
    English
    arrow-up
    8
    ·
    edit-2
    5 days ago

    New data centers should have to pay on a sliding scale based on energy availability in the local grid. And if they want to build out generation it should be solar and wind only.